The Steel Fabrication Process, Step by StepFrom drawing review to dispatch: what happens in a heavy fabrication job
Knowing the steps helps you plan, ask better questions and spot delays. This guide walks through a typical heavy steel fabrication job.
Best suited to projects with an indicative value of ₹10 lakh and above. Larger projects welcome.Typical Steps
- 1. Drawing and specification reviewScope, material, design code and inspection needs are checked.
- 2. Material preparationPlate and sections are sourced, checked and marked out.
- 3. Cutting and formingParts are cut, rolled or formed to the drawing.
- 4. FittingParts are assembled and aligned before welding.
- 5. WeldingJoints are welded to the agreed procedure.
- 6. InspectionChecks and tests are carried out to the agreed requirements.
- 7. Surface preparation and finishingDone as specified, for example blasting and coating.
- 8. Dispatch and erectionItems are supplied to site, and erected if the scope includes it.
Why the Steps Depend on Your Specification
The exact steps, materials, welding procedures, inspection and finishing depend on the specification you provide. That is why a written specification and agreed inspection requirements at the start prevent most problems later.
Where WABSUS Fits
WABSUS manages engineering coordination and quality control, and fabrication is carried out through qualified manufacturing partners and approved facilities. See our heavy fabrication service.
Quality Checks Along the Way
- Material checked against the order before cutting
- Dimensions checked after cutting and forming
- Fit-up checked before welding
- Welds inspected as the specification requires
- Final dimensional and finish checks before dispatch
Documents Commonly Agreed
- Approved fabrication drawings
- An inspection and test plan
- Material certificates
- Welding procedures, where specified
- Dispatch and packing details
What Causes Delays
- Late drawing approvals
- Material availability
- Design changes after fabrication starts
- Inspection holds
- Transport and site access problems
Need fabrication for your project?
A short brief is enough to start. Drawings can follow.
Frequently Asked Questions
How long does fabrication take?
It depends on size, complexity and quantity. We share a schedule with the quotation.
What is inspection in fabrication?
It is checking that the work meets the drawing and specification, for example by measuring, visual checks and any tests you require.